Mark Harry

Mark Harry

 

 Follow our Blog

 

  MAISON DESIGN

MAISON DESIGN
Architectural Design Consultancy

 
Mark Harry

Home
About Us
Services
The Design Process
Planning
Local Councils
Projects
Related Links

 

Office Address

25 Caldicot Road
Rogiet
Caldicot
Monmouthshire
NP26 3SE

Tel 01291 422712

email mark@maisondesign.biz

 


 


 

Orangery with Kitchen,Rehabilitation Suite CONTEMPORARY DWELLING
ORANGERY WITH BESPOKE KITCHEN MAJOR RELIFT TO COUNTRY HOUSE
LEAN-TO UPGRADE THORNWELL PAVILION
EXTENSIONS TO BUNGALOW HEMP AND LIME BUILDING
BUNGALOW ON NARROW PLOT ECO COTTAGE REFURBISHMENT
NEW BUNGALOW CHURCH HALL
GRANNY ANNEXE FACE LIFT, EXTENSION AND LEISURE
DETACHED GARAGE WITH CINEMA ROOM ABOVE EXTENSION ON EXTENSION
NEW DETACHED HOUSE CONSERVATORY HYBRID
SUN LOUNGE WITH GARDEN ASPECT LEISURE BUILDING
TWO STOREY REAR EXTENSION SUNLOUNGE TO COTTAGE
SIDE EXTENSION TO 1930 HOUSE NEW BESPOKE HOME
SUN LOUNGE WITH ARCHED HEAD METHODIST CHURCH EXTENSION
ST BRIAVELS CASTLE EXTENSION TO TRANSFORM ONE SMALL BUNGALOW
BRYN GWYNANT YOUTH HOSTEL

 

'

Various front and rear extensions complete with Conservatory and new driveway

The bungalow before works start
The jcb has removed all the top soil down to reduced levels for the new driveway. Thank goodness it's sunny and dry Foundations dug out at rear ready for concrete
Front bedroom extension with roof carcassing almost complete. Just 3 weeks into the job. Amazing Rear extension shell being constructed. This prolonged dry spell is a bonus
Front Bedroom extension, shell, complete. The front dormer has now been removed Rear extension up to wall plate level. Just 4 weeks into the project
Akward bit of roof carcassing which tested the skills of the carpenter. Worked out well Rear elevation with roof carcassing completed to rear roofs. Base of Conservatory completed
Bedroom with Jack'n Gill bathroom. First fix finished all ready for plastering Bedroom 1 extended. Floor levels to be made good
Rear view of levelled garden from Conservatory (base) Driveway being constructed
Shell of Conservatory has been erected. Newly applied render is being painted before the glass is installed Front driveway (with first fall of snow)
Rear view of Conservatory and extensions. Garden paths, planting etc still to come. Front view of almost completed project
Frozen rain hanging out of the roof hopper. Christmas 2010 Rain water frozen from the outlet of the down pipe
 
 Return to list of projects
 

Disclaimer - Please read
Site designed by Mark Harry, Programmed by JETA Solutions Ltd

Adidas Ultra Boost Shoes Adidas Springblade Skechers D Lites Supra Bleeker Nike Air Max Shoes Adidas Originals Superstar II Adidas Yeezy Boost 350 Adidas NMD XR1 Sneakers Adidas Stan Smith Adidas Originals Superstar Nike Sock Dart Kids Nike Air MAX 90 Air Force 1 Low BR Shoes Nike Sock Dart Nike Air Huarache Nike Internationalist Adidas Original NMD Adidas Ultra Boost Shoes UK Air Jordan Shoes Adidas Yeezy 350 Boost Turtle Dove