Mark Harry

Mark Harry

 

 Follow our Blog

 

  MAISON DESIGN

MAISON DESIGN
Architectural Design Consultancy

 
Mark Harry

Home
About Us
Services
The Design Process
Planning
Local Councils
Projects
Related Links

 

Office Address

25 Caldicot Road
Rogiet
Caldicot
Monmouthshire
NP26 3SE

Tel 01291 422712

email mark@maisondesign.biz

 


 


 

CONTEMPORARY DWELLING ORANGERY WITH BESPOKE KITCHEN
MAJOR RELIFT TO COUNTRY HOUSE LEAN-TO UPGRADE
THORNWELL PAVILION EXTENSIONS TO BUNGALOW
HEMP AND LIME BUILDING BUNGALOW ON NARROW PLOT
ECO COTTAGE REFURBISHMENT NEW BUNGALOW
CHURCH HALL GRANNY ANNEXE
FACE LIFT, EXTENSION AND LEISURE DETACHED GARAGE WITH CINEMA ROOM ABOVE
EXTENSION ON EXTENSION NEW DETACHED HOUSE
CONSERVATORY HYBRID SUN LOUNGE WITH GARDEN ASPECT
LEISURE BUILDING TWO STOREY REAR EXTENSION
SUNLOUNGE TO COTTAGE SIDE EXTENSION TO 1930 HOUSE
NEW BESPOKE HOME SUN LOUNGE WITH ARCHED HEAD
METHODIST CHURCH EXTENSION ST BRIAVELS CASTLE EXTENSION
TO TRANSFORM ONE SMALL BUNGALOW BRYN GWYNANT YOUTH HOSTEL

 

'

Pavilion for Thornwell Football Club. Communial building to serve the whole of the local community. Energy features will consist of Ground Source Heat pump, low temperature underfloor heating, Rain water harvesting, Grey water to sanitary ware and Heat recovery system...

3D Southern aspect of Pavilion set back into the embankment
Embankment at rear of football pitch before works start Part embankment dug out to the Pavilions reduced levels. All spoils can be lost on site
Creation of path to existing Car park. As you can see there has been prolonged heavy rain. Typical View of Rainwater Harvesting tank in its laid state
Dumper carrying soil with foreground coil of underground heating pipe End view of Hall up to dpc
Side view of Kitchen and toilet areas up to dpc level All stop for Christmas. Its just too cold. What with minus 5C as the norm over the last few days. At least the slab was laid during the normal temperatures and also the Portal frame has been erected.
Thornwell football pitch and goals with the bare bones of the Pavilion as a backdrop End view of Portal frame
roof carcassing almost completed desite the awfull weather that we have all encountered. gable from the main hall below protruding out from the front roof. All the rafters have been birdsmouthed over the purlins to remove the imposed thrust.
almost completion of phase 1. Doors to be fixed and the feature window Side view showing the boiler house door and the covered main entrance
Front Facade of Phase 1 GOAL !!! The Pavilion as seen from the goal mouth
 
 Return to list of projects
 

Disclaimer - Please read
Site designed by Mark Harry, Programmed by JETA Solutions Ltd

Adidas Ultra Boost Shoes Adidas Springblade Skechers D Lites Supra Bleeker Nike Air Max Shoes Adidas Originals Superstar II Adidas Yeezy Boost 350 Adidas NMD XR1 Sneakers Adidas Stan Smith Adidas Originals Superstar Nike Sock Dart Kids Nike Air MAX 90 Air Force 1 Low BR Shoes Nike Sock Dart Nike Air Huarache Nike Internationalist Adidas Original NMD Adidas Ultra Boost Shoes UK Air Jordan Shoes Adidas Yeezy 350 Boost Turtle Dove