Various front and rear extensions complete with Conservatory and new driveway
The bungalow before works start
The jcb has removed all the top soil down to reduced levels for the new driveway. Thank goodness it’s sunny and dry
Foundations dug out at rear ready for concrete
Front bedroom extension with roof carcassing almost complete. Just 3 weeks into the job. Amazing
Rear extension shell being constructed. This prolonged dry spell is a bonus
Front Bedroom extension, shell, complete. The front dormer has now been removed
Rear extension up to wall plate level. Just 4 weeks into the project
Akward bit of roof carcassing which tested the skills of the carpenter. Worked out well
Rear elevation with roof carcassing completed to rear roofs. Base of Conservatory completed
Bedroom with Jack’n Gill bathroom. First fix finished all ready for plastering
Bedroom 1 extended. Floor levels to be made good
Rear view of levelled garden from Conservatory (base)
Driveway being constructed
Shell of Conservatory has been erected. Newly applied render is being painted before the glass is installed
Front driveway (with first fall of snow)
Rear view of Conservatory and extensions. Garden paths, planting etc still to come.
Front view of almost completed project
Frozen rain hanging out of the roof hopper. Christmas 2010
Rain water frozen from the outlet of the down pipe